BUILT FOR WIND. DELIVERED ON SITE.
We specialise in on-site machining and repair for wind turbines — from the nacelle to the foundation, in the workshop and out in the park.
Trusted by wind operators and OEMs across Europe and North America
- Vestas
- Siemens Energy
- NextEra Energy
- GE Vernova
- Enercon
- Nordex
- EDF Renewables
- Welcon
- RWE
- CS Wind
- EEW
- Muehlhan
- Nicon Industries
- Orsted
- Cadeler
- Vattenfall
- Smulders
- Windar
- Titan Wind
- SubC Partner
- Semco Maritime
- LM Wind Power
- Iberdrola
- Vestas
- Siemens Energy
- NextEra Energy
- GE Vernova
- Enercon
- Nordex
- EDF Renewables
- Welcon
- RWE
- CS Wind
- EEW
- Muehlhan
- Nicon Industries
- Orsted
- Cadeler
- Vattenfall
- Smulders
- Windar
- Titan Wind
- SubC Partner
- Semco Maritime
- LM Wind Power
- Iberdrola
A WORKSHOP THAT COMES TO YOUR TURBINE
Removing a turbine component for shop repair costs days of downtime, crane mobilisations, and risk. We bring the precision instead. Our mobile machines repair yaw rings, blade roots, and tower flanges in place — onshore or offshore — to OEM tolerance.
THREE PLACES WE WORK
Pick the part of the turbine you need fixed. Each track lists the specific services we deliver and the platforms we support.
-
UptowerNo cranes. No nacelle removal. Reduced downtime
Uptower machining solutions for yaw teeth segments, rotor locks, bolts and threads. Repair instead of replacing the component, minimizing downtime and eliminating heavy logistics.
-
BladeBlade root and bushing repair on-site.
World-first on site blade root remanufacturing with We4Ce. CNC Onsite has teamed up with We4Ce, an international blade rotor and blade root connection expert, to deliver a complete repair solution focused on high-strength blade roots.
-
Structures & FlangesSub-millimetre flatness. On-site or in-workshop.
Monopiles, transition pieces, tower sections. CNC Onsite flange-facing machine offers precise milling for transition pieces and monopiles of up to 10 meters for improved reliability, service life and maintenance costs.
GOT A WIND CHALLENGE?
Tell us the turbine, the part, and the timeline. We respond within one business day.